Sign In | Join Free | My futurenowinc.com
China Foshan ABD Equipment Co., Ltd. logo
Foshan ABD Equipment Co., Ltd.
ABD Machine, a Brilliant Design for YOU!
Verified Supplier

3 Years

Home > Colour Coating Line >

PLC 380V 50Hz Colour Coating Line CE Certification Production Equipmenet

Foshan ABD Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

PLC 380V 50Hz Colour Coating Line CE Certification Production Equipmenet

Brand Name : ABD

Certification : CE

Place of Origin : Guangdong,China

MOQ : 1 set

Price : Negotiation

Supply Ability : 10 Sets per month

advantage : high efficiency and lower cost,saving powder

Key component parts : PLC,motor,pump,coating powder booth and so on

Coating : Powder Coating

Applicable Industries : Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery

Manufacture time time : 4 months

Voltage : 380~440V, 110V/220V, or Customers Local Voltage, 50~60H

Dimension(L*W*H)) : about 45x24x13.5 meters

After-sales service provided : Engineers on hand to repair gear abroad

Contact Now

Project specifications

Colour Coating Line With V Shaped Powder Coating Booth For Aluminium Profiles

This proposal is designed for aluminum profiles vertical powder coating line—One Booth

1,Design data

A, Coating Material : Aluminum Profile

B, Technical Description:Loading ,pre-treatment ,drying , powder coating, Curing ,unloading .

C, coating profile specifications:

a. Max size of the profile : 100mm×200mm×L7000mm

b. Max Weight of the profile: 30KG

c. Standard weight : 3.5kg

d. Standard surface area of the profile : 400m2/T

e. Conveyor speed 1200mm/min (500mm/min ----- 20000mm/min adjustable )

2, Energy supply

A,Power supply

Single-phase voltage:220V+10%

Three-phase voltage:380V+10%

Frequency:50Hz

Equipment group line and zero line

B,Natural gas

3,compressed air

A,pressure : 7.0bar

B,Max steam flux: 1.3g/nm3

C,Max oil content: 0.01ppm

D,Max Flux of the compressed air: 8m3/min

4,Industrial water required

A,Pressure : 3+0.2bar

B,Flux; 5m3/h

5,Pure water

A,Conductivity : 10us/cm

B,Flux; 4m3/h

6,Powder

A,Powder characteristic : LEL≥40g/Nm3

7,Space between material hanging : 66mm,100mm,133mm,150mm,200mm

8,Production Capacity

Conveying chain speed: 1.2m/minute

Total coating pcs per hour: 1200mm/minute÷150mm/pcs×60minutes=480pcs/hr

Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr

Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day

Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month

9,Energy consumption reference for powder coating

Max Energy Consumption of Common Powder Coating

No.
Equipment Names
Electric
Natural Gas
Water
Pure wate
1

Conveyor system

4KW
2

Pre-treatment

75KW

5m3/H

4m3/H

3

Drying oven

15KW

31m3/H

4

Powder coating system

60KW

5

Curing Over

35KW

65m3/H

Total

189KW

96m3/H

5m3/H

4m3/H

About Us

Foshan Anbang De Mechanical Equipment Co., Ltd. (formerly Dali Hongwei Aluminum Industry Co., Ltd. in Nanhai District, Foshan City) was established in 1996 and changed to Foshan Anbang De Mechanical Equipment Co., Ltd. in 2012. The company is located in Fanhu Economic Development Zone, Leping Town, Sanshui District, Foshan City. It covers an area of 50 acres and has a building area of 25000 square meters, with approximately 230 people. Its main products include a fully automatic vertical electrostatic powder spraying production line for aluminum profiles, a fully automatic vertical oxidation coloring electrophoresis production line for aluminum profiles, and a fully automatic vertical fluorocarbon spraying production line for aluminum profiles.

PLC 380V 50Hz Colour Coating Line CE Certification Production Equipmenet

FAQ

Q1: Are you trading company or manufacturer ?
A1: We are factory and can do the exporting work by ourselves.

Q2: How long is your delivery time?
A2: About 50 workdays after received the deposit.

Q3: What is your terms of payment ?
A3: T/T and Irrevcoable L/C. 30% T/T in advance, 70% balance before shippment.

Q4: Can engineers service overseas?
A4: Yes, totally no problem.

Q5: What about the guarantee period?
A5:You will have 12 months guarantee time for the powder coating booth, if the parts broken as our mistake, we will send you by DHL.


But as we do the pre install before the laoding, so this situation won't very easy to happen we believe.


After one year, if you still have any help about the equipment, please feel free to contact us at any time, as we will supply you lifelong service.


Product Tags:

380V Colour Coating Line

      

PLC Colour Coating Line

      
Wholesale PLC 380V 50Hz Colour Coating Line CE Certification Production Equipmenet from china suppliers

PLC 380V 50Hz Colour Coating Line CE Certification Production Equipmenet Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Foshan ABD Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)